Select: PT FR EN
Metalworking

Work Performed

Turbine body of Pelton D = 1030 mm
Gorona del Viento – Central C.H. EL HIERRO
Structures
Subcontract ‐ GALP2 (Sines)
Built structures and beams
Subcontract-RENAULT (Tanger‐Marrocos)
B2BAG
Container Refiner
Transitions for turbine
Turbine supply line
EFASEC phase transformer